Opera Grill Chester
Proposal
Supply Air Island Canopy / Bespoke BBQ Canopy / Odour Control / Gas Interlock / General Ventilation / Air Conditioning / Toilet Ventilation / Fire Suppression / ESP
Actions
CK Direct Ltd was invited to tender for the refurbishment of the former Methodist Chapel in Pepper St Chester, transforming it into Chester’s premier dining experience.
The ventilation system was by far the most challenging aspect of the project, with heavy restrictions from the local council and DEFRA guidelines and the whole project under scrutiny.
To remain compliant and meet all guidelines, CK Direct installed a 4000mm x 3000 mm Island Canopy with Service Distribution Unit for the main kitchen and a 2000 mm x 1800 mm wall canopy over the front-of-house bespoke BBQ Unit.
As well as the extract system, CK Direct also installed:

Tempered Supply Air System

Gas Interlock System

Fire Suppression Systems

Tempered Supply Air System
The whole project used over 600 metres of square, spiral and rectangular duct, all manufactured in-house.
The project took 3 months, a completion date 3 weeks ahead of schedule.

Even though the Canopy was not a regular size, that didn’t seem to faze the estimator at CK Direct Ltd. Turnaround time and price were extremely competitive compared to the other extraction companies...
David Martin
Contracts Manager, Opera Grill Chester