Gino’s Hull

Proposal

Supply wall Canopies / Air Supply System / AirTeck 64GEX Ozone Odour Control / General Ventilation / Air Supply / Toilet Ventilation/ Fire Suppression

Actions

CK Direct Ltd took on this job with full knowledge of what was needed and has liaised with the consultants to make sure that the relevant parts were supplied and fitted as per the agreed spec.

The work was completed over a strict 4 week window and in conjunction with all of the other trades on site.

CK Direct installed a massive 6000mm x 1500mm canopy to the main kitchen

CK Direct also installed all of the fresh air systems and Fire suppression.

As well as the extract system, CK Direct also installed:

Tempered Supply Air System

Tempered Supply Air System

Gas Interlock System

UV Ozone System

Fire Suppression Systems

Fire Suppression Systems

Tempered Supply Air System

Airteck 64GEX Ozone Systems

Tempered Supply Air System

Toilet Ventilation

The whole project used square, spiral and fire rated duct, all manufactured in-house.

“CK Direct did a great job in managing this project from start to finish.

They advised on all aspects of the job
And nothing was too much for them to solve!”

– Site Manager